Photo © terra-infiniti.com
This transcontinental ship began to be developed back in 2004. However, he made his first flight only after 5 years. This was due to minor design errors, which were subsequently corrected.
The Dreamliner completed its first transcontinental flight on July 2, 2011. Before the first commercial flight I had to wait a few more months. But here everything went, unfortunately, not very smoothly. Problems from the technical side could not be avoided. Departures had to be debugged, the liner additionally double-checked.
In turn, its owners hoped to "appease" their customer service. They tried to create a feeling of increased comfort with a diverse menu interspersed with exotic and pleasant surprises. The Dreamliner delighted passengers with exquisite alcohol, snacks and desserts.
As for the internal atmosphere, in the cabin it was thought out to the smallest detail. The role, almost the main one, was played by the special SkyInterior lighting scheme. The color of the cabin changed depending on the phase of the flight.
Here, the solution of issues with security arrived in time. The technical component has been fixed. What comfort can be without the most basic?